top of page

Search


Feb 12, 2022
Day 36: Laying the Groundwork
Fresh Flooring Creates A New Foundation


Sep 24, 2021
Day 35: Enough is Enough
"Final" exterior sanding and restoration before The Traveling Pheasant gets a professional paint job!


Mar 18, 2021
Day 22: Sheer Refinement
Touchups after cutting the service opening leave the trailer looking fabulous.


Feb 26, 2021
Day 19: A Chilly Milestone
The barn doors are finally finished! Watch the update video to see the progress.


Feb 18, 2021
Day 17: Looking Back to Look Forward
Looking back with refections on our struggles but looking forward with the rear interior frame restoration.


Feb 11, 2021
Day 16: Let's Get Symmetrical
Up until now, one barn door was sanded and the other- sadly not. This week, the left side catches up with a facelift of its own.


Feb 9, 2021
Day 15: Nice Backside!
PART 2 of "Meet Me In The Back" post. See the ramp completed and yet another attempt to smooth the front side of wings.


Feb 4, 2021
Day 14: Meet Me At The Back - Part 1
Work begins on the back side of the trailer and the rear ramp and wings receive major TLC.


Jan 26, 2021
Day 13: Step to The Front
I return to sanding the exterior and the trailer's front side and doors are transformed.


Jan 15, 2021
Day 10: Turning A Page
Side Sanding, Roof Improvements & Passing Inspection! We are back to work on the horse trailer renovation with even more sanding. Today,...

Dec 17, 2020
Day 9: Patching Holes & Tips on Bondo
I embarked on the long process of sanding down the entire exterior surface area of the trailer and share DIY tips on using Bondo.


Dec 3, 2020
Day 8: Chalk Marks
Roof makeover & sneak peak on the interior design for The Traveling Pheasant mobile coffee bar.


Nov 10, 2020
Day 5: Undercoating
After all the work of sanding, I was anxious to to paint an area to look like new. I also learned a surprising lesson along the way...


Nov 2, 2020
Day 4: Let There Be Light!
Today's focus was to rewire the lighting and repair broken wires in order to pass inspection. We also removed the floor and side panels!


Oct 26, 2020
Day 3: Sanding Begins
Today’s focus was to sand and treat the entire interior - in one day. Not to mention tearing up the floor and removing the window bars!
bottom of page