Mar 18, 2021Day 22: Sheer RefinementTouchups after cutting the service opening leave the trailer looking fabulous.
Feb 26, 2021Day 19: A Chilly MilestoneThe barn doors are finally finished! Watch the update video to see the progress.
Feb 18, 2021Day 17: Looking Back to Look ForwardLooking back with refections on our struggles but looking forward with the rear interior frame restoration.
Feb 11, 2021Day 16: Let's Get SymmetricalUp until now, one barn door was sanded and the other- sadly not. This week, the left side catches up with a facelift of its own.
Feb 9, 2021Day 15: Nice Backside!PART 2 of "Meet Me In The Back" post. See the ramp completed and yet another attempt to smooth the front side of wings.
Dec 17, 2020Day 9: Patching Holes & Tips on BondoI embarked on the long process of sanding down the entire exterior surface area of the trailer and share DIY tips on using Bondo.
Dec 3, 2020Day 8: Chalk MarksRoof makeover & sneak peak on the interior design for The Traveling Pheasant mobile coffee bar.